top of page

Ventura Travelift Pier Repair

Ventura Travelift Pier Repair

Ventura Harbor Boatyard’s 35 ton travelift pier was struck by a 70’ commercial fishing vessel.  The pier was damaged beyond repair.

 

Cushman was contracted to demolish and replace one finger of the pier. Concrete pilings and concrete deck was removed and piles and new concrete deck installed.  The existing rip rap under the pier was removed and reinstalled.

bottom of page