|
Job Name:
MAMMOTH WWTP PHASE 1 AND 2
Location:
MAMMOTH, CA
Job Description:
The Mammoth WWTP was an 8 million dollar job that consisted of two phases. The first phase included new pavement on a 13,500 square foot lot, new filter press wash water piping, filtrate collection manifold, potable H20 supply, and dealt with constructing a filter press building/truck loading bay, a digester building, and modifications to existing filter press building, sludge pump system, standby generator and modifying the lab building. Phase 2 scope of work included improvements to the existing wastewater treatment facility to include a primary clarifier, aeration basins, headworks, filter pumps, electrical and instrumentation.
|