The Monterey Marina replacement job required the removal of the existing dock system and the simultaneous installation of a new concrete dock system which included new piles, gangways and utilities.
CUSHMAN CONTRACTING COMPANY
P.O. Box 147, Goleta, CA 93116-0147 - (805) 964-8661